Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | canal, gmcc, manchester, metrolink, peel, peelholdings, salford, towpath |
Date time: | 12.06pm, Friday 31st August, 2012 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Ancoats |
Contraflow cycle lane but a bit close to the parked cars. Very confusing give way at the end of the cycle lane Would have been better to extend the cycle lane without the kink in it and without the give way. Suggest extend facility beyond the junction with cycle icons with or without lane lines.
NB this is part of my suggested temporary diversion for the towpath obstruction. Closure is for 2 months from 20 August see #44689 and #44687
Comments reflect the views of the original submitter only.