Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | chisholmtrail |
Date time: | 1.45pm, Tuesday 10th November, 2020 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | kenwarner |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Ken Warner |
Area: | Cambridge |
Work in the north compound on Tue 10/11/20 is all to do with shipping out the parts of the big crane, but some lucky chaps have already walked on the new Chisholm Trail river bridge.
Comments reflect the views of the original submitter only.