Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 3.10pm, Tuesday 7th January, 2020 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | tomajeffs |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Ancoats |
This is part of the diversion from the Fallowfield Loop while the bridge is being replaced, but the lack of dropped kerbs makes it inaccessible by bicycle or wheelchair.
Comments reflect the views of the original submitter only.